# Justified Data Campus: water permits and construction milestones

A permit-based analysis of Justified Data Campus, with two funding scenarios and a daily water-withdrawal example.

[Back to blog](https://altss.com/blog)

Share

 [LinkedIn](https://www.linkedin.com/sharing/share-offsite/?url=) [X](https://x.com/intent/tweet?url=&text=Justified%20Data%20Campus%3A%20water%20permits%20and%20construction%20milestones)  Copy link

Justified Data Campus's June 2027 construction deadline precedes expected phased delivery. An investor must map permitted works to funded phases.

In its [July 6, 2026 filing](https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001104659-26-080583/0001104659-26-080583.pdf), TeraWulf announced a 20-year Anthropic lease for approximately 401 MW of critical IT load through landlord Raylan Data LLC at the Hawesville, Kentucky campus. It expected phased delivery from late 2027 into early 2028. A [November 4 update](https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001628280-26-069810/wulf-20261104.htm) gives the later schedule: late 2027 through the second quarter of 2028, with rent commencing on delivery of each data hall.

This case uses permit versions dated before October 15, retrieved November 13, and the separately dated November delivery update; later permit changes were not verified.

## Map construction to delivery

Kentucky's [Stream Construction Permit 37387](https://dep.gateway.ky.gov/eSearch.WebApi/api/documentGenerate/getDocument/14445191), for Justified DataPower LLC, runs through June 19, 2027. Covered construction must finish by then. Extensions are possible; its form calls for requests at least 30 days before expiry, or May 20 by calendar arithmetic. Engineering review should check the requirement to elevate HVAC and electrical equipment above the base flood elevation.

Consider two fictional plans, not reported Justified schedules or financing terms:

- Plan A: covered works finish May 31, 2027; commissioning continues into 2028. Completion evidence could support the related draw.
- Plan B: covered works continue until July 15, 2027. Before funding that work, the investor would require an approved extension or other valid coverage, rather than only a filed request.

Neither differing deadlines nor these fictional scenarios establish a breach or delay.

## Model water against the daily constraint

The [requirements for withdrawal Permit 0653](https://dep.gateway.ky.gov/eSearch.WebApi/api/documentGenerate/getDocument/14385505) authorize a year-round maximum of 2.0 million gallons per day across the specified three-well field. Monitoring and records are daily; reporting forms are due monthly by the 15th.

In a deliberately fictional forecast, six days at 1.0 million gallons and one at 2.4 million produce a 1.2-million daily average. The peak still exceeds a 2.0-million daily limit. This illustrates the measurement basis, not Justified's consumption.

For a proposed phase, an investor could request the peak-day estimate and its basis, including any simultaneous construction and operating demands. Averaging the forecast can conceal the day that needs a different supply or sequencing assumption.

During drought or emergencies, the Cabinet can change permit conditions temporarily. A Cabinet finding of harm to existing permitted users or other lawful water users triggers a requirement to change or stop withdrawals. A supply-restriction sensitivity case should therefore test the operating response without presenting the restriction as a forecast.

## Keep the construction-discharge term on its own calendar

The [KYR10U650 coverage letter](https://dep.gateway.ky.gov/eSearch.WebApi/api/documentGenerate/getDocument/14406018), addressed to Fluor for the Raylan Project, concerns construction stormwater discharges. Coverage takes effect on the letter's May 26, 2026 date and automatically terminates two years later, on May 26, 2028, unless an extension is requested beforehand or coverage is revoked earlier. The letter requires compliance with the master general permit.

That date falls within the updated delivery quarter. The relevant duration is the period of covered construction discharges. The letter does not document an operating cooling-water discharge authorization.

Power delivery can create its own cash trigger, as Altss's analysis of [AIB's utility-linked site purchase](https://altss.com/blog/aib-texas-data-center-site-utility-deferred-price) shows.

## Current Altss product information

Product reference revised: 2026-11-12.

Altss provides private-markets intelligence for investment, fundraising and institutional business development. Research organizations, people, funds and companies with ownership, commitment, transaction and relationship context. Intelligence provides research; Capital adds Fundraising OS workflows. Revenue and Agents accept scoped, manually reviewed requests.

Altss software licenses are annual. Separately contracted research, tasks, services and publishing engagements have their own terms when available. Current prices and eligibility are published on [Pricing](https://altss.com/pricing). Altss does not offer a free trial.

Public records carry source-specific dates where available. No population-wide measured refresh cadence or universal verification deadline is established here. Page modified, source captured, fact observed, entity verified and aggregate measured describe different events. Check the date attached to the relevant claim; a missing verification date means unknown. Stored source history does not establish a customer-facing historical-analysis interface.

Standard subscription intelligence is used in-platform. No public raw-data API, CSV export or bulk download of Altss content, data feed or graph-replication access is offered; customers can export their own data. Public factual pages and their Markdown equivalents may be read and cited. Agents accepts scoped requests for bounded paid results through manual commercial review. The separate Altss Console publishes authenticated REST and MCP interfaces and a catalog for bounded SEC financial research using public issuer filings. Follow its connection guide and current tool catalog for account eligibility, credential setup, scope, quotes and funding requirements. This does not grant private-company dossiers, contact enrichment or unrestricted graph access. See the [platform scope](https://altss.com/platform) and [current methodology](https://altss.com/methodology). This note describes the current product and supersedes earlier product statements, prices, counts and refresh cycles in the article; the article retains its original publication and source dates.

Share this article

Share

## Related articles

[Image: Top 6 Private-Company Deal-Sourcing Databases Used by PE & VC Firms (2026)](https://altss.com/blog/top-6-private-company-deal-sourcing-databases-used-by-pe-and-vc-firms-2025)

Private Markets  18 min read

### [Top 6 Private-Company Deal-Sourcing Databases Used by PE & VC Firms (2026)](https://altss.com/blog/top-6-private-company-deal-sourcing-databases-used-by-pe-and-vc-firms-2025)

Updated for 2026: the six platforms buy-side teams actually use—PitchBook, S&P Capital IQ Pro, SourceScrub, Grata, CB Insights, and Altss—with ownership ch

[Altss Research](https://www.linkedin.com/company/altss)  Oct 6, 2025

[Image: A removable report face for Citadel and a separate reveal shield for HBK illustrate restatement versus later disclosure of historical holdings.](https://altss.com/blog/13f-amendments-restatement-new-holdings-citadel-hbk)

Private Markets  4 min read

### [13F amendments: replacing a report or adding previously omitted holdings](https://altss.com/blog/13f-amendments-restatement-new-holdings-citadel-hbk)

13F restatements and additions need different dataset operations. Exact Citadel and HBK filings show reporting-period and entry-count boundaries.

[Altss Research](https://www.linkedin.com/company/altss)  Oct 15, 2026

[Image: A three-date comparison instrument separates June30 holdings, August14 filing and October15 observation,107days after the holdings date.](https://altss.com/blog/13f-october-2026-june-holdings-q3-reporting-deadline)

Private Markets  6 min read

### [13F dates in October 2026: June holdings and the Q3 deadline](https://altss.com/blog/13f-october-2026-june-holdings-q3-reporting-deadline)

Original Q2 filings and current SEC guidance explain holdings dates, filing dates, the Q3 deadline and what an October 13F observation can establish.

[Altss Research](https://www.linkedin.com/company/altss)  Oct 15, 2026

## Canonical URL

https://altss.com/blog/justified-data-campus-water-permits-construction-timeline